Hi All,

 

pls suggest

 

Objective is to have…

 

Minimum stock level maintenance at Plant level.

Re-order qty maintained at Sloc level

Replenishment qty maintained at Sloc level

 

we have total three demands for same material.

 

I have a demand for Safety stock

I have another demand for Sloc 001

I have another demand for Sloc 002

 

my requirement i want to plan at sloc using MRP indicator MRP 4 view. Which spk to be used. What steps are to be followed


 

a)PR to generate a Purchase Order based on Sloc consumption or drops below safety stock for the Plant.

   to have one PR to have ONE Purchase Order with 3 line items as each line item will have its own delivery address.

 

 